Quick Facts
Location
Florida
Role
Prime Contractor
Completion Date
October 2018
Project Overview
Phillips was contracted to furnish all labor, equipment, and related support services to perform engineering and construction work for substation security walls projects at multiple service territories in accordance with the contract.
Project Highlights
21,276
Linear Feet of 14' Walls Installed
10
Motorized Sliding Gates Installed
Phillips Contribution
The scope of work on all sites included providing project management, engineering, permitting, and construction services to build 14-foot-high security walls with motorized sliding gates. These walls were 12’ above ground and 2’ below ground and ballistic rated to protect electrical substations. Phillips was also responsible for data collection and field visits, as well as SUE, geotechnical, and survey services; permit research; engineering design and permitting; post-design services; and construction services.