Quick Facts
Location
Wytheville, Virginia
Role
Prime Contractor
Completion Date
October 2018
Project Overview
This project involved grading for a 5.3-acre substation pad expansion for the Jackson’s Ferry 765kV Substation located in Wytheville, Virginia. Total site disturbance of 24.47 acres was required for the installation of three storm retention ponds and relocation of the station’s access road.
Project Highlights
89,900
CY Cut to Fill
5.3
Acres of Fine Grade Pad
1,200
LF of Storm Drainage
Phillips Contribution
Phillips performed erosion control installation and maintenance, site grading, storm water installation, and final stabilization. The soil material had to be cut from underneath the existing 765 kV conductor. Phillips developed a comprehensive, site-specific safety plan to eliminate the possibility of incidents while working under the conductor.